New Drainage for Playing Field

 
  As a club we are delighted to announce that the club through the unstinting hard work of Paul Hodgson and Duncan Moyle and through the magnificent support of both the trustees of the Seaton welfare and CISWO have been able to secure grant funding that will allow the field to be dug up and drainage installed that should ensure that the field is one of the best in the county. The work on the field started on the 7 July 2010 and is progressing well.
Further pictures updates will be posted here as and when available

This was the state of the pitch before remedial work was undertaken , and to be honest this was one of the better days when the photos were taken.

FIELD

FIELD

FIELD

WORK STARTS 7 JULY 2010

.

DRAINAGE PIPES BEING INSTALLED

.

.

HOLLOWS AND LOW SPOTS BEING FILLED IN AND LEVELLED

FILLED IN DRAINAGE PIPES RUNNING THE FULL LENGTH OF THE FIELD

HAROLD KEEPS AN EYE ON THINGS

THE AREA TO ONE SIDE OF THE FIELD IS CLEARED AND FLATTENED TO CREATE A TRAINING AREA

INSTALLING THE LAST OF THE DRAINAGE PIPES

DRAINAGE CHANNELS FILLED WITH SOIL AND RESEEDED

LOW SPOTS IN FIELD FILLED AND LEVELLED

TRAINING AREA LEVELLED AND SEEDED

TRAINING AREA LEVELLED AND SEEDED

THE FINISHED PRODUCT DRAINS INSTALLED, LEVELLED, RESEEDED

AND THE GRASS GROWING BACK WELL

 

HOME